Professional installation cabinet master kitchen installation experience
Release time:2018-03-14 17:07 clicks: 2902

When we set up the cabinets, we usually hand them directly to the decorator to handle it. However, in fact, we can't see whether it is good or bad at the inspection stage. Here's what we should pay attention to when it comes to cabinet installations! As a custom-made product, the installation of cabinets is an important process for the sale of finished cabinets. The cabinets are cluttered. Although the technical content is not too large, there are many details. It is appropriate to complete every step of the operation to arrive at the perfect display of the final molded product. Therefore, the quality of the cabinet device can be applied to cabinet products. And the brand has a general understanding. Whether or not the cabinet device is in place not only directly relates to the beauty of the cabinet, but also affects the use of the cabinet. The cabinet installation is a process full of details. The cabinets, hanging cabinets and countertop installations all have a lot of places to pay attention to.


Notes on Cabinet Units Before installing cabinets, manufacturers should promptly contact the consumers to understand the construction of the kitchen in consumers' homes in order to ensure that the cabinets can be installed smoothly. The kitchen cabinets must be finished after the kitchen floor tiles, wall tiles are laid, and the water transformation is completed. If the walls of the kitchen have hollow walls, they must be reported to the cabinet manufacturers in a timely manner. Since the hollow walls cannot be installed in the cabinet, the construction team needs to prepare in advance. The device thing. Hu Yongzhong indicated that if the installation workers did not fully understand the consumer's home situation, it may happen that the cabinet could not be installed after arriving at the scene and the device was delayed. The overall cabinet device generally requires two device technicians. After the cabinet enters the market, the cabinets will be installed in the order of cabinet-hanging cabinet-tabletop-faucet, water basin-cooker, and electric appliance.


The cabinet device: Before installing the cabinet, workers should clean the kitchen floor in order to accurately measure the ground level. If the cabinet and the floor cannot reach the level when the device is installed, the gap between the cabinet doors cannot be balanced. After the device worker uses the level ruler to measure the ground and the wall surface, the level conditions on the ground can be understood and the level of the cabinet can be adjusted finally. If the floor cabinet is L-shaped or U-shaped, it is necessary to find out the reference point first. The L-shaped floor cabinet extends from the right angle to both ends. If the installation from the two ends to the center may present a gap, the U-shaped floor cabinet will be the center first. The square-shaped cabinets are stacked neatly and then stacked on two ends from two right angles to prevent gaps. After the ground cabinets are piled up, they are required to level the floor cabinets and adjust the level of the cabinets through the conditioning legs of the floor cabinets. The connection between the cabinets is also an important process of the cabinet device. Generally, four connectors are required to connect the cabinets to ensure the tightness between the cabinets. In order to save the cost of equipment, some cabinet manufacturers use low-quality self-tapping screws to connect. Self-tapping nails not only affect the beautifulness of the cabinet, but also lock the cabinet body from one end, and the convergence is not high.


Hanging cabinet device: After the cabinet device is completed, the hanging cabinet device can be mounted. When the device is used to hang the cabinet, horizontal lines are drawn on the wall to ensure the level of the bolts. In general, the horizontal line and the table are separated by 650 mm. According to the situation of their own height, they can propose to the foreman the adjustment of the interval between the cabinet and the cabinet so that it can be used in the future. When connecting the cabinet to the cabinet, it is also necessary to connect the cabinet with the connecting piece to ensure the tightness of the connection. After the cabinet device is completed, it is necessary to adjust the level of the cabinet. The level of the cabinet directly affects the goodness of the cabinet.


Mesa device: Because the kitchen decoration will lead to errors in the dimensions of the original cabinet floor plan, in order to reduce errors, some cabinet manufacturers will install the countertops again after a period of time when the cabinet and the cabinet device are closed. This facilitates the designer to adjust the cabinet and The counter errors that may be presented after hanging the cabinet device ensure the accuracy of the cabinet device data. According to reports, most of the countertops used by consumers nowadays are man-made stone or natural stone countertops. Stone countertops are made of several pieces of stone glue. The moment of bonding, the amount of glue used, and the degree of grinding will affect the beauty of the countertops. Normal summer bonding time requires half an hour, winter takes one hour to one and a half hours, and special glue is used for bonding. In order to ensure the beauty of the countertop seams, the installation worker should use a sander to polish it.


Hardware: basins, faucets, baskets are also the highlights of cabinets. In the installation of cabinets and countertops, in order to prevent the sawdust from falling into the trajectory of the basket, cover the basket with a covering to avoid affecting future use. The basin device hits the water problem. When installing the cabinet, the launching device will use the method of opening the hole at the site, and use a professional puncher to make holes according to the size of the pipe. The diameter of the hole should be at least 3-4 mm larger than the pipe, and the hole should be opened after drilling. Some of them are sealed with sealing strips to prevent the water from swell and deformation at the edge of the wood, which will affect the service life of the cabinet. In order to prevent the basin or the water from seepage, the connection between the hose and the basin should be sealed with a sealing strip or glass glue. The hose and the sewer should also be sealed with glass glue. Because the sewer pipe is located at the bottom of the floor cabinet, consumers cannot check it. Some installation workers do not use glass glue seals to save costs, which may cause odors or water leakage in future sewers. If the cabinet is leaking, there are generally three possible reasons: First, the water tub leaks at the connection with the hose, and secondly, the connection between the pipeline and the water leaks. Another condition is the quality of the pipeline itself.


Appliances for cooking appliances: Devices for embedded appliances in cabinets only require on-site opening of the power supply hole. However, the power supply holes cannot be opened too small to avoid inconvenient disassembly when repaired in the future. Some consumers have asked the workers to wrap up because the water meter and the gas meter are not beautiful. Hu Yongzhong indicated that if the workers wrap up the water meter and the gas meter, the maintenance will be troublesome in the future, and the state has relevant regulations that do not allow the meter and gas meter to be packaged. When the range hood is installed, the interval between the range hood and the cooktop is generally between 750-800mm to ensure the application and smoking. If the height of the device is too high, it will affect the smoking effect. When the cooker hood is installed, it must be aligned with the cooker, and the height can be adjusted according to the actual situation. The most important thing for the cooker is to connect the air source. It must be ensured that the air inlet does not leak. The gas source should generally be sent by a natural gas company. If it is a decoration worker's device, it is also necessary for the natural gas company to detect whether there is a leak.


Adjusting the cabinet door: The final process of installing the cabinet cabinet is to adjust the door panel to ensure that the cabinet door gap is even and horizontal. The depth of the cabinet is generally 550 millimeters, and the cabinet is 300 millimeters. Consumers can also adjust according to actual conditions. After adjusting the doors, workers should also sort out the waste left behind when installing the cabinets and ensure that the owner's kitchen is clean.